All Resources in Australia-New Zealand

Case Study

Traffic Force Uses Assignar to Connect 3 Depots Across Western Australia

Before implementing Assignar, Formula Alberta faced significant challenges in maintaining safety and engineering documentation. They relied on hard copy books that contained the relevant documentation, which contributed to delays, mismanagement, and loss of documents. Formula Alberta had to maintain safety documentation records in case of an impromptu audit to meet safety audit requirements, which was a tedious process.

Read More
Workzone Traffic Control
Case Study

Workzone Traffic Control Saves 32 Hours Per Week

Before implementing Assignar, Formula Alberta faced significant challenges in maintaining safety and engineering documentation. They relied on hard copy books that contained the relevant documentation, which contributed to delays, mismanagement, and loss of documents. Formula Alberta had to maintain safety documentation records in case of an impromptu audit to meet safety audit requirements, which was a tedious process.

Read More
Case Study

How Field Data Keeps Subterra Civil Building

Subterra has experienced significant growth over the years, extending its services to various multidisciplinary projects. As the business expanded, Subterra faced challenges in managing timesheets, tracking machine service and maintenance, and facilitating effective communication between the field and the office.

Read More
Case Study

How Formula Alberta Improved Safety Communication

Before implementing Assignar, Formula Alberta faced significant challenges in maintaining safety and engineering documentation. They relied on hard copy books that contained the relevant documentation, which contributed to delays, mismanagement, and loss of documents. Formula Alberta had to maintain safety documentation records in case of an impromptu audit to meet safety audit requirements, which was a tedious process.

Read More
Case Study

How Real-Time Reporting Improves Efficiencies with Martinus Rail

Assignar has been a fantastic solution for Martinus Rail, enabling engineers to track daily true costs up-to-the-minute, which was impossible with spreadsheets or paper dockets. Shelley and her team worked with supervisors on site to integrating Assignar into daily work, which helped to make their jobs easier, more efficient and freeing up staff for other tasks.

Read More
Case Study

How J&S Drilling Improves Efficiency & Reduces Downtime

Before March 2022, J&S Drilling faced challenges in tracking their field staff. They relied on spreadsheets, PDFs, and writable forms for tracking their progress onsite.  A mix of technological advancements and client expectations meant that ‘everybody wanted everything – almost live’. Waiting until the end of a project to get the paperwork and analyze the data was not cutting it. 

Read More
Case Study

No Office, No Problem: Deverni’s Success Story

As a mobile company, Deverni needed to find paperless solutions and overcome logistical restrictions caused by the pandemic. Additionally, the uncertainty around underground utilities made it crucial for Deverni to adopt a safe and efficient method of excavation.

Read More
Case Study

Managing Three Family Businesses with Assignar

Lily Hedges runs operations for three family businesses based in Australia: Enteq, Site & See, and Hydro-Vac Operations. 

After using Assignar at their flagship dry hire business Enteq since 2016, Hedges and her team didn’t hesitate to implement it in the family’s two new ventures. Here’s how she uses Assignar to manage three businesses and the value it provides for these family-run companies.

Read More
Dynamic Hydro Excavations
Case Study

Transforming Reporting with Dynamic Hydro Excavation

As a growing company, managing operations using traditional methods became increasingly time-consuming and prone to errors. The use of paper documentation, including timesheets, forms, and dockets, was causing unnecessary double handling and delays.

Read More
Kwik Logistics
Case Study

Kwik Logistics saves 4 hours a day and $35k per year

As a prominent provider of crane hire, specialized transport, and traffic control in Western Australia, Kwik Logistic achieved remarkable growth over the years, catering to diverse projects in mining, commercial, residential, civil, and renewable energy sectors. As the company expanded, the team recognized the need for modernizing its operational systems to support its growth.

Read More